Home

About Gifford MarineServicesSuppliesStorageBoat RentalsTides, Weather, Kid's PagesMeet and E-mail the Staff

I have recently engaged the help of two of my best mechanics to finish the wiring and get all the systems up and running. We have wired all the batteries and covered the same with fiberglass grating and two support pieces to hold the grating down, this will ensure that the batteries can't move. We have the steering system working and also the hydroplanes. I have however, a small problem with synchronizing the two planes, I may need to install a flow divider in the hyd. system. We are now half way through the wiring and should have all the systems operating by the end of Feb. after that comes the installation of the conning tower and side ballast tanks, till then down scope.

Dsc01260.jpg (66318 bytes)

Dsc01261.jpg (58696 bytes)

Dsc01250.jpg (37023 bytes)

Dsc01253.jpg (146823 bytes)

Dsc01257.jpg (155044 bytes)

Dsc01256.jpg (40802 bytes)

Dsc01258.jpg (72089 bytes)

Dsc01259.jpg (63111 bytes)

Dsc01263.jpg (55127 bytes)

Dsc01254.jpg (68948 bytes)