| I have recently engaged the help of two of
my best mechanics to finish the wiring and get all the systems up
and running. We have wired all the batteries and covered the same
with fiberglass grating and two support pieces to hold the grating
down, this will ensure that the batteries can't move. We have the
steering system working and also the hydroplanes. I have however, a
small problem with synchronizing the two planes, I may need to
install a flow divider in the hyd. system. We are now half way
through the wiring and should have all the systems operating by the
end of Feb. after that comes the installation of the conning tower
and side ballast tanks, till then down scope. |

|

|
|

|

|

|

|
|

|

|

|

|
|