12/27/02 The sub is coming along great, the batteries have been installed for both the generator and main propulsion. All the motors including the drive motors are in and ready to wire up. I have also installed the motor controllers and all the relays needed for shifting to reverse. The high pressure bilge pump is in place under the seat assembly along with the DC to AC 4000 watt inverter this is needed to operate the pumps while under water. One of the battery chargers is installed and all of the main wiring will start this week. Please stay tuned as work will be progressing at a faster pace now. Thank You
Bill |
|||||
| PS. The clothing line will be up shortly at both our site and www.psubs.org please check them out. Sorry for the delay. | |||||
|
|
|||||
|
|
|||||