|
I am sorry it has
taken so long to finish the sub, but as you can imagine a marina can
be a very busy place this time of the year. I had to overhaul the
support boat before her condition deteriorated any further. The boat
is very important to any future plans involving the sub.
During the
testing process I caused some minor damage to the port ballast tank
that I have since repaired. I am in the process of installing single
point lifting eyes through the main hull. The lifting straps were
putting too much of a load on the side tanks. It was very hard to
control the sub during the testing because of this.
The sub has been
underwater at the dock, with only one small leak in a pipe coupler
that was not tightened properly, also I have tested the ballast
system and everything worked perfectly. It looks like I may have to
add some more ballast to the keel if I find her stability is a
problem with one side tank empty, and one full. I can't be sure of
this without having the proper lifting eyes for safety reasons. I
will keep you updated as soon as possible. There should be a new
update within the month. You can take a look at the support vessel
pictures in the last update.
Here are a few more
pictures from one of our target sites. |